Michael Perret

I work as a requirement engineer/software engineer at FHNW and was the technical lead for this project.

Case Study
16/10/2025
Auditorio 1
en
The full story of the Upgrade from Plone 5 to 6 of the University of Applied Sciences North Western Switzerland.
User
Developer
Intermediate
Beginner
Case Study
Plone: Frontend
Plone: Backend
16/10/2025
Alfa
en
For our project at FHNW (see Talk „FHNW CMS Upgrade Project“) we migrated 130k objects from Plone 5.2 with Mosaic to Plone 6.0 with Volto 18. We used collective.exportimport and extended it so Mosaic widgets became Volto blocks during the migration. In this talk we present interesting technical details as well as general topics related to the migration.
Integrator
Intermediate